musashi-logo

ESS400 Energy
Storage System

Backup Beyond UPS BATTERIES

A “Plug and Play” highly efficient and power-dense energy storage solution that provides intelligent and dependable energy storage for UPS's used in backing up mission-critical power systems.

A “Plug and Play” highly efficient and power-dense energy storage solution that provides intelligent and dependable energy storage for UPS system used in backing up mission critical power systems.

ENERGY-STORAGE-SYSTEM

MUSASHI’S HYBRID SUPERCAPACITOR (HSC) BASED ENERGY STORAGE SYSTEM.

Our Hybrid SuperCapacitor technology surpasses battery-based alternatives in performance, reliability, safety, maintenance and costs. Boasting an impressive 15-year+ operational lifespan our ESS400 Systems effectively mitigate the thermal runaway hazards (fire) commonly associated with lithium-ion batteries (LiBs) while avoiding the use of toxic lead acid in high-maintenance, valve-regulated lead-acid batteries (VRLAs). And our approach to highly reliable backup power offers lower Cap-EX costs and significant reductions in Op-EX over other energy storage methods.

Packaged in a compact 24″ wide cabinet, the scalable system offers 400kW with up to 10,000 kW/seconds of energy storage per cabinet. The ESS400 incorporates our power-dense CPP4100SA prismatic cells in easy-access modules with room for input/output cabling, disconnects and includes an energy management system with modbus communication. This configuration makes our ESS400 ideal for 3-phase UPS applications where space is at a premium, reliability is everything and lowering CAP-EX and OP-EX is a must.

FAST BRIDGE TIME TO GENERATORS

The ESS400 ability to back-up critical load to allow transition to generators (15 to 60 seconds) is key, rendering longer backup times wasteful in cost, space, and maintenance.

Extended Operating Temperature Range

Our convection cooled HSCs adapt to a wide 0ºC to 40ºC temperature range, aligning with data centers’ higher temperature environments and reducing cooling requirements compared to battery-based installations.

Higher Power Density

Musashi’s HSCs lead in power density, crucial for energy-intensive operations like AI, virtualization, and bitcoin mining within high-performance IT servers.

Cost-Effective Solutions

Our ESS400 minimizes deployment and ongoing operational expenses, offering competitive Cap-Ex and significantly reduced Op-Ex costs for mission-critical operations.

ESS-system

ESS400 Performance Comparisons

Power Density (kW per m2)

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

Power-Density

ENERGY
STORAGE
REDEFINED

logo_beyond

Cycle Life @ 100% Depth of Discharge

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

cycle-life-graph

ENERGY
STORAGE
REDEFINED

logo_beyond

Replacement Intervals

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

replacement-intervals

ENERGY
STORAGE
REDEFINED

logo_beyond

Footprint (m2) with Service Area

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

footprint-chart

ENERGY
STORAGE
REDEFINED

logo_beyond

Weight (kg)

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

weight-graph

ENERGY
STORAGE
REDEFINED

logo_beyond

Safety characteristics

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

safety-characteristics-table

ENERGY
STORAGE
REDEFINED

logo_beyond

Cap-Ex (including Freight, InStall, Start-Up)

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

capex

ENERGY
STORAGE
REDEFINED

logo_beyond

cap-Ex + Op-Ex (15 Years)

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

opex-graph

ENERGY
STORAGE
REDEFINED

logo_beyond

Operating Temperature

Based on 1MW UPS load and 30 seconds to allow bridging to backup generator

operating-temp-graph

ENERGY
STORAGE
REDEFINED

logo_beyond
MusashiMESLogo_Hz-white

CONTACT US

Complete the form below for more information, to be contacted, or to request a quote. Embark on your journey towards a greener, more sustainable future with Musashi Energy Solutions. 

Address: 50 W. Big Beaver Rd. Suite 100
Troy, MI 48084
Phone: 858-361-9558
Email: mesinfo@musashina.com